Collapse layer of the mortar, construction materials, brick, and stones, covering floor layer and collapse of different phases (20093). - CRFM
Possible displaced floor preparation material and/or wall collapse associated with Phase 3 Roman occupation. the material has been churned up and folded over by the plough, which may explain why this SU covers the floor levels 20091, 20095.
SU 20094: extension of 20094 in the NW corner
SU 20094: deposit, view toward North